By finish I just mean floors and walls. No bathroom, no waterproofing/sump pump french drain (already done). Just need to drywall and do a floor. Anyone know? Thanks! |
   
oots
Citizen Username: Oots
Post Number: 437 Registered: 6-2001
| Posted on Sunday, July 16, 2006 - 11:25 am: |
|
yes you do-studs & insulation all need inspection as well as electric. oots |
   
J L Bryant
Citizen Username: Jeffbryant
Post Number: 1 Registered: 6-2002
| Posted on Tuesday, July 18, 2006 - 9:06 am: |
|
Slightly expanded answer/clarification: If you're only performing walls & studs(ie. non-structural framing), you do not specifically need a permit (that is, in NJ.... & assuming the local town ordinances do not require one - which should be a simple phone call to the bldg dept.). Insulation within such partitions(basements~interior walls)is also not a permit issue, again unless by town ordinance. However as oots noted, if you're doing any electrical work, a permit would be necessary. The most prudent course is to check w/ the bldg. dept. Of course, if you installed a bathroom & sump pump before (w/o permits), I'm wondering if you're hesitant about asking/involving the bldg. dept. But THE answer should come from the town. |
|